Transforming an outdated shower requires more than replacing visible finishes, it demands careful coordination of waterproofing, drainage, wall construction, tile installation, and enclosure dimensions to create a dependable wet-area system. With Minneapolis Kitchen & Bath Remodeling bringing 20 years of specialized remodeling experience, our licensed Bathroom Remodeling Contractors build and renovate walk-in showers using porcelain tile, ceramic tile, natural stone, waterproof wall systems, tempered glass, and corrosion-resistant hardware suited to Minneapolis homes. Our Kitchen and Bathroom Remodeling Contractors manage shower renovations from demolition and substrate preparation through waterproofing, tile installation, plumbing coordination, glass enclosure installation, and final inspection.
Our shower remodeling services include walk-in shower construction, shower pan replacement, wall tile installation, niche construction, bench installation, linear or center drain configurations, glass door installation, semi-frameless enclosures, and custom shower layouts. We coordinate tile size, grout selection, fixture placement, slope requirements, enclosure clearances, and surface transitions to accommodate both compact bathrooms and larger primary suites. Material selections are evaluated for water exposure, maintenance requirements, slip resistance, durability, and compatibility with the bathroom's existing flooring, vanity, lighting, and plumbing fixtures.
We begin each project with a detailed assessment of the shower enclosure, plumbing connections, wall structure, floor condition, drainage configuration, and existing moisture protection before determining the appropriate remodeling approach. Our installation standards include properly sloped shower floors, continuous waterproofing systems, sealed penetrations, correctly positioned drains, reinforced areas for grab bars or benches, precise tile transitions, and accurate glass measurements to control water migration and maintain structural integrity.
Our Bathroom Remodeling Contractors also repair showers affected by cracked tile, failed grout, leaking joints, deteriorated waterproofing, damaged shower pans, loose fixtures, and drainage problems while determining whether localized repairs or a full wet-area reconstruction provides the appropriate solution. By addressing concealed moisture pathways and compromised substrates instead of covering existing defects, we help prevent recurring damage and protect adjacent flooring, walls, cabinetry, and framing.
A complete walk-in shower remodeling project typically takes 7–14 calendar days after demolition begins, with the schedule determined by structural repairs, waterproofing requirements, tile patterns, and glass fabrication. The work progresses through demolition and preparation, waterproofing, tile installation, fixture installation, glass fitting, sealing, and final inspection, while curing periods may affect the completion date. Our Minneapolis bathroom remodeling professionals coordinate each stage to establish a properly waterproofed, structurally sound, and durable walk-in shower.
Get a FREE Quote

Our walk-in shower remodeling service restructures the bathing area around accessibility, drainage, waterproofing, fixture placement, and available bathroom dimensions. We can develop low-threshold or curbless configurations, depending on floor construction and drainage requirements, while incorporating shower benches, niches, handheld fixtures, and strategically positioned controls. Each component is coordinated before installation to establish appropriate clearances and a practical shower footprint.
Waterproofing forms a critical part of the shower assembly, so we use suitable waterproof membranes or approved shower waterproofing systems behind tile and at vulnerable transitions. Shower floors are formed with the required slope toward the drain, while corners, penetrations, seams, and changes in plane receive appropriate waterproof treatment. Tile is then installed over the prepared assembly using compatible setting materials to create a durable finished enclosure.
Our bathroom remodeling contractors coordinate the shower enclosure with the bathroom's plumbing and electrical requirements, including valve locations, showerheads, handheld sprays, lighting, and ventilation considerations. We position controls where they can be reached without requiring unnecessary movement into the water stream. The resulting configuration combines controlled water management with a practical layout suited to the dimensions and use of the bathroom.

Shower tile installation requires more than placing finished tile over a wall because the underlying assembly must manage continuous moisture exposure. We prepare shower walls and floors with a properly detailed waterproofing system before installing porcelain, ceramic, natural stone, or other selected tile materials. Tile dimensions and surface characteristics are considered alongside drainage, grout-joint requirements, niches, benches, and enclosure geometry.
We establish tile reference lines to maintain consistent courses around corners, fixtures, niches, and transitions between wall planes. Thin-set mortar is selected according to the tile and substrate, while controlled application helps achieve appropriate coverage and stable bonding across the shower surface. Floor tile is arranged to accommodate the drain location and shower slope without creating abrupt height changes or poorly aligned cuts.
Grout and flexible sealant are applied according to the location and movement characteristics of the shower assembly. Changes of plane, corners, and selected penetrations receive appropriate flexible joints rather than relying exclusively on rigid grout. This layered construction provides a finished shower surface supported by a properly prepared water-resistant assembly.

Frameless glass shower enclosure installation provides a clean enclosure design using tempered safety glass with carefully coordinated hardware and support points. We determine glass panel dimensions from the completed shower opening, finished tile surfaces, floor slope, wall alignment, and door swing requirements. Hardware finishes can be coordinated with shower fixtures and other bathroom elements for a consistent appearance.
Glass thickness and panel configuration are selected according to the enclosure design, opening dimensions, hardware requirements, and applicable safety considerations. We accurately position hinges, clamps, handles, and support components so loads are transferred appropriately to suitable mounting locations. Door clearances are also verified to prevent interference with walls, fixtures, vanities, or other bathroom components.
Seals and appropriate clearances are incorporated around the glass where required to control water movement without compromising door operation. We check panel alignment, hardware engagement, door swing, and drainage conditions during final installation. The finished enclosure provides an open visual profile while maintaining a controlled separation between the shower area and the rest of the bathroom.

Shower fixture remodeling updates the water-delivery components to improve usability while coordinating new fixtures with the existing or remodeled shower configuration. We can install shower valves, fixed showerheads, handheld sprays, slide bars, diverter systems, body sprays, and other compatible components according to the planned plumbing arrangement. Fixture locations are established based on user reach, shower dimensions, wall construction, and the position of benches or niches.
Plumbing modifications may require access to existing supply lines and careful coordination with the shower valve assembly. We verify connection points, fixture compatibility, valve placement, and pipe routing before the finished wall surfaces are closed. Where multiple outlets share a diverter system, the configuration is planned to provide controlled selection between the intended water-delivery functions.
Our bathroom remodeling contractors also coordinate trim installation with the finished tile surface so escutcheons, handles, and showerheads sit properly against the completed assembly. We test the installed fixtures for operation and inspect visible connections for leakage or improper alignment. This approach integrates new shower hardware with the waterproofed enclosure rather than treating fixtures as separate finish components.
We begin the shower remodeling process by evaluating the existing enclosure, wall framing, plumbing locations, floor slope, drain position, ceiling height, ventilation, and areas showing signs of moisture intrusion. Our technicians use moisture meters, laser levels, digital levels, stud finders, measuring equipment, and visual inspection tools to identify substrate deterioration and establish accurate dimensions for the new shower assembly. The assessment determines whether the existing framing, drain location, water supply lines, and surrounding surfaces can accommodate the planned walk-in shower, tile system, and glass enclosure.
The waterproofing design specifies the shower pan, wall membrane, drain assembly, backer board, sealants, and transition components according to the selected shower configuration. We use waterproof tile backer systems, sheet membranes or liquid-applied waterproofing products, compatible bonding materials, prefabricated or site-built shower pans, and manufacturer-approved sealing components to create continuous protection behind the finished tile. Shower niches, benches, curb systems, corner transitions, plumbing penetrations, and control-valve openings are incorporated into the waterproofing plan rather than addressed after tile installation.
Before demolition, we establish the finished dimensions for shower walls, floor slope, niche placement, bench height, fixture locations, and glass enclosure boundaries. Our crew protects surrounding flooring, doors, cabinets, fixtures, and occupied areas using polyethylene barriers, floor protection, negative-air equipment where appropriate, and controlled debris removal. These preparation measures establish the working area for a shower remodeling project designed around proper drainage, moisture control, tile installation, and enclosure installation in Minneapolis, MN.
We remove the existing shower enclosure, wall finishes, pan, fixtures, and other designated components using reciprocating saws, oscillating tools, pry tools, drills, and controlled hand-demolition methods. Our team separates materials during removal and uses dust barriers, HEPA-filtered vacuums, protective coverings, and debris containers to reduce airborne particles and protect nearby finished areas. Once the enclosure is opened, exposed framing, subflooring, plumbing lines, and existing drain components are inspected for conditions requiring correction before reconstruction.
Plumbing preparation can include repositioning hot and cold water supplies, installing new shower valves, modifying riser pipes, replacing drain assemblies, and establishing connections for handheld sprays or multiple shower outlets. We use PEX, copper, brass valve bodies, compatible fittings, PVC or ABS drain components, solvent cement where appropriate, threaded connections, and manufacturer-specified seals based on the plumbing configuration. Pressure and connection checks are performed before wall cavities are closed so accessible plumbing joints can be evaluated for leakage or improper installation.
The shower base and wall assembly are then prepared around the required drainage geometry and finished elevations. We use mortar beds, prefabricated shower bases, sloped substrates, cement backer board, waterproof membranes, sealant, waterproofing bands, and prefabricated corner components according to the selected shower system. Proper slope toward the drain, stable wall surfaces, accurately positioned plumbing penetrations, and sealed transitions are verified before tile or other finish materials are installed.
We install the waterproofing system across shower walls, corners, floor areas, niches, benches, and penetrations using the specified membrane, waterproof backer board, bonding mortar, sealant, and reinforcement accessories. Our installers treat inside and outside corners, seams, fastener penetrations, valve openings, pipe penetrations, and changes in plane with compatible waterproofing components to maintain continuity throughout the enclosure. Waterproofing coverage is inspected before tile installation because finished tile and grout do not substitute for the underlying waterproof barrier.
Tile installation proceeds using porcelain tile, ceramic tile, natural stone, mosaic tile, or other selected materials with thin-set mortar compatible with both the tile and waterproofing system. We use wet saws, diamond blades, tile cutters, leveling systems, spacers, notched trowels, grout floats, and tile-setting tools to establish controlled joints, accurate cuts, consistent slopes, and minimal lippage across walls and floors. Shower niches, benches, accent bands, plumbing openings, corners, and floor drains are integrated into the tile layout so the finished enclosure maintains both functional drainage and consistent alignment.
The glass enclosure is installed after tile surfaces have cured and required dimensions have been verified. We use tempered safety glass, appropriate hinges or sliding hardware, wall anchors, setting blocks, compatible gaskets, silicone sealants, and manufacturer-specified fastening systems according to the enclosure design. Door swing, panel alignment, waterproofing transitions, handle placement, and clearance around shower controls are checked to ensure the glass system operates properly without interfering with the finished shower.
We complete the remodeled shower with a detailed inspection of waterproofing transitions, tile surfaces, grout joints, plumbing fixtures, drain performance, glass panels, doors, seals, and accessory mounting points. Our technicians use levels, visual inspection equipment, controlled water testing, and dimensional checks to verify that shower surfaces direct water toward the drain and that installed components remain properly positioned. Shower valves, diverters, handheld sprays, showerheads, and drains are operated to identify leakage, poor drainage, loose fittings, or improper fixture function.
Final detailing includes grout correction, flexible sealant application, glass cleaning, hardware adjustment, fixture tightening, and removal of construction residue from tile and enclosure surfaces. We inspect silicone joints at corners, glass interfaces, plumbing penetrations, curb transitions, and other locations where controlled sealing is necessary to protect adjacent construction. Any identified installation issue is corrected before the enclosure is released for normal use.
The final walkthrough verifies the shower's drainage, fixture operation, enclosure movement, tile condition, grout consistency, waterproofing-related finish details, and accessory placement. We remove protective films, dust barriers, debris, unused materials, and temporary coverings while cleaning the completed shower with products compatible with the installed surfaces. Minneapolis, MN property owners receive a professionally remodeled shower with coordinated waterproofing, durable tile installation, functional plumbing, and properly fitted glass enclosure components.
Shower remodeling requires more than replacing visible tile because the concealed waterproofing assembly controls how water is managed behind the finished surface. We evaluate the existing shower walls, floor, plumbing configuration, drainage location, substrate, and signs of moisture intrusion before determining which components require removal or replacement. The new assembly can incorporate a compatible waterproofing membrane, properly sloped shower base, sealed penetrations, and moisture-resistant wall construction according to the selected shower system.
Walk-in shower floors require positive drainage toward the drain without low areas where water can collect after use. Shower bases may use prefabricated systems or site-built assemblies depending on dimensions, drain configuration, and design requirements. Wall waterproofing extends across the designated wet area and receives particular attention around valves, showerheads, niches, benches, corners, and other penetrations.
Tile installation follows the completed waterproofing system rather than serving as the primary waterproofing barrier. Porcelain, ceramic, stone, and other approved shower tile materials can be installed with compatible mortars and grout systems based on the substrate and exposure. Properly treated movement joints and perimeter transitions help accommodate minor building movement while maintaining the integrity of the finished shower enclosure.
Walk-In Shower Configuration and Glass Enclosures
Walk-in showers are planned around available bathroom dimensions, entry clearance, shower controls, drain position, storage requirements, and the intended glass enclosure configuration. We establish the location of shower valves, handheld fixtures, rain showerheads, niches, benches, and grab-bar reinforcement before closing the wall assembly. This coordination prevents utility conflicts and allows accessories to be supported at appropriate structural locations.
Glass enclosures can use fixed panels, hinged doors, sliding configurations, or combinations designed around the shower opening. Measurements are taken after finished wall and tile conditions are established so the enclosure dimensions correspond with the completed opening. Tempered safety glass, appropriate hinges or channels, seals, and mounting hardware are selected according to the enclosure design.
Shower tile layout also considers the position of glass panels, corners, niches, controls, and plumbing fixtures. Larger-format porcelain can reduce the number of grout joints, while smaller mosaics can provide additional traction and conform more readily to certain shower floor configurations. Grout and sealant specifications are selected according to the tile material and areas exposed to continuous moisture.
Minneapolis bathroom remodeling must account for indoor temperature and humidity variations throughout the year, particularly in spaces with frequent steam and moisture exposure. Proper ventilation, waterproofing, sealed penetrations, and compatible materials help control moisture around the shower assembly. Existing conditions are reviewed before installation to identify damaged substrates, deteriorated framing, plumbing concerns, or previous waterproofing failures.
A shower remodel can also incorporate accessibility-oriented features such as low-threshold entries, handheld shower systems, built-in seating, grab-bar reinforcement, wider access openings, and strategically positioned controls. These features are coordinated during framing and waterproofing rather than added after the finished tile is installed. Their placement is determined by bathroom dimensions and the user's functional requirements.
Final inspection includes checking drainage, waterproofing transitions, tile alignment, grout joints, fixture connections, glass clearances, door operation, and finished sealant joints. The shower enclosure is reviewed to ensure panels and doors operate correctly without interfering with fixtures or bathroom access. Each visible and functional component is evaluated before the remodeled shower is placed into regular use.
Plan the shower configuration around drainage, waterproofing, tile, fixtures, storage, and enclosure requirements before demolition begins. Request an assessment to identify existing moisture conditions and determine the appropriate shower base, wall system, plumbing changes, and glass configuration. Contact Minneapolis Kitchen & Bath Remodeling to establish the specifications for your shower remodeling project.
A shower remodeling project commonly requires several days to multiple weeks depending on demolition, waterproofing, plumbing changes, tile installation, and glass enclosure fabrication. Custom glass measurements generally occur after the finished shower opening is established, which adds fabrication time before final enclosure installation. The project schedule should be confirmed after the existing shower assembly and proposed specifications are evaluated.
A shower waterproofing system can use a sheet membrane, liquid-applied membrane, waterproof backer system, or another compatible assembly designed for wet-area construction. The selected system must provide continuous protection across walls, corners, penetrations, niches, benches, and the shower floor transition. Waterproofing is installed according to the manufacturer's requirements and integrated with the shower drainage system before tile installation.
Frameless glass enclosures can be suitable when the shower opening, wall structure, tile installation, and door configuration provide adequate support and clearance. Tempered glass panels are installed using appropriate hinges, channels, clamps, and hardware designed for the enclosure's dimensions and weight. Accurate final measurements are necessary because frameless systems have tighter tolerances than heavily framed configurations.
A built-in shower niche can provide dedicated storage for bathing products without requiring freestanding shelves inside the shower. Its framing, waterproofing, slope, tile layout, and dimensions must be established before the wall finish is installed. The niche should be positioned away from plumbing conflicts and detailed so its horizontal surfaces direct water toward the shower area.
Yes, walk-in showers can incorporate low-threshold or curbless entries, handheld shower fixtures, grab-bar reinforcement, seating, wider openings, and strategically positioned controls. These features require advance coordination because framing, drainage, waterproofing, and wall reinforcement must accommodate the intended configuration. The bathroom's floor structure and existing drain location should be evaluated before selecting a curbless or low-threshold design.
Get skilled, dependable kitchen and bath remodeling from Minneapolis's trusted local team.